Since we are doing the built-in in 2 different pieces (bottom and top), we've started repeating Saturday and Sunday's steps. I am loving this repetition because it means there's a light at the end of the tunnel.
While I was at work, Brent attached all the bottom shelving to the base:
And did all the wiring (pre-spackle photo):
Then it was back to Home Depot to have the cuts made for the top:
And while Brent is currently building those shelves, I've started painting the shelf backs:
Definitely a productive day. I'm trying not to read too much into the fact that the day things get done is the day I'm not there.
No comments:
Post a Comment