Saturday, June 26, 2010

Ready for a beer (man cave)

The keg box is plugged in and cooling down. Since beer is the most important part of the bar to Brent, that area is now ready to go.

A look inside the keg box:
The keg tap is ready for some action:

Brent demonstrating how it will work, for anyone confused:
The back countertop
Since we spent more than expected on the front countertop (which is being delivered Wednesday!!!), we decided to spend minimal on the back countertop. And by minimal, I mean $16.17. We just picked up some peal and stick tiles and went at it.

In other news
Brent downloaded the vuvuzela app on his phone, and is having his own little celebration while watching the US soccer game. He is driving me nuts.

2 comments:

  1. This is a fun blog and lots of great projects. I'm signing up to follow you and I invite you to do the same. I also have a party called the Boardwalk Bragfest on Wednesdays -- it's a lot of fun. LOVE your before and afters!

    ReplyDelete
  2. we want more inside the keg box pics please! :)

    ReplyDelete